Projects

Transportation of equipment for the Ecolant plant in Vyksa using three configurations of road trains, with the use of rolling out a barge using the Ro-Ro method.

Transportation of a fractionating column measuring 73x6. 4x6. 5 meters and weighing 350 tons on the route Volgograd-Nizhnekamsk

As soon as possible, a backup transformer was delivered from the Balakovo NPP to the Rostov NPP.

Specialists of our company organized the delivery of equipment from the Rybinsk cargo port to the construction site of the consignee.

The difficulty in this transportation consisted in stopping traffic on a section of the route due to restrictions on the width of the roadway and a large number of vehicles located on the side of the road.

During transportation, HOLDHOFER PST/SL self-propelled modular platforms were used to optimize the dimensions of road trains and carry out simultaneous transportation of two units of heavy equipment.

As part of the project for the construction of a potash processing complex of the EuroChem Group of Companies, measures were taken to deliver equipment.

Our company together with employees of RTL LLC, as part of the construction of an electric steelmaking complex, in the area of the village of Vyksa, Nizhny Novgorod region, organized the delivery of equipment.