Transportation of equipment for the construction of a new line at Russian Gas Turbines LLC
As part of one of the stages of construction of the new line of Russian Gas Turbines LLC  in the Yaroslavl region, our specialists organized the delivery of equipment from the Rybinsk cargo port to the construction site of the consignee.
 
One of the features of this project was that transportation work was carried out in a limited space, for which it was decided to use a self-propelled modular platform for better maneuverability.
For the implementation of this project, our specialists carried out a number of preparatory measures that allow us to change the configuration of road trains in the shortest possible time for timely and high-quality delivery of equipment.
Thanks to the well-coordinated work, the equipment was transported in full in accordance with the technical task within the established time frame.
The maximum height of the road train exceeded 11 m., and the weight of the heaviest road train-more than 200 Tons.