Transportation of large-sized equipment to the construction site of the Ural Steel plant in Novotroitsk

Transportation route: Rostov-on-Don – Novotroitsk.

To transport these goods and minimize damage to roads, road trains were used in various configurations with low-bed trailers from companies such as Faymonville.

The dimensions of road trains reached: Length 40.4 m, Width 3.75 m, Height 4.90 m.