During this year, our company transported 75 blades for wind farms in the south of Russia. In view of the fact that the dimensions of the blades were 49.5 x 3.6 x 2.8 meters, special trailers with triple telescoping were used. The route length was more than 400 km.
After this transfer, we transported all parts of the wind turbine (gondolas, hubs, generators, towers and blades). The total volume of components transported for the construction of wind turbines exceeded 450 car trips.