In April 2021, the lining of the reactor shaft for the Akkuyu NPP was transported. Transportation was carried out in the city of Volgodonsk with subsequent loading on motor vehicles.
The dimensions of the road train reached: Length 21.8 m, Width 8.3 m, Height 10.3 m.